What we do · RTUs & Gateways
RTUs & Gateways
The box between the site and everything else. It polls instruments, buffers locally, and forwards when the link returns.

What we measure
10 parameters on this area.
Every reading is timestamped on arrival. Where the link drops, the gateway holds the readings and forwards them when it returns.
What we measure · RTUs & Gateways
10 parameters · 5 on a schedule · 5 reported on an event
- Energy metersAC / DC·pulse, ModbusEvery minute
- Dimmer and LDR%, luxEvery minute
- Fuel sensorsL·%Every 5 minutes
- Solar, battery bank, UPSU, I, SoC·V, A, %Every minute
- Fire and smoke detectorsstateOn change
- Flood detectionstateOn change
- Gas and water leak detectionstateOn change
- GPS and asset trackinglat, lonEvery minute
- Geofencingin / outOn change
- On/off device controlcommandOn demand
What is fitted is decided at survey. This is the range we specify from, not a list of what every site gets.
Also monitored
The other four areas.
Environment
Air, water and effluent, recorded continuously rather than when someone remembers to take a reading.
11 parameters11 continuous
Open
Energy
Generators, street lighting, distribution assets and metering points, reporting state and consumption from wherever they are installed.
10 parameters9 continuous · 1 on event
Open
Agriculture
Water, power and climate on land nobody is standing on: tank levels, pump state, gate and store status.
9 parameters7 continuous · 2 on event
Open
Water Management
Wells, mains and reservoirs reporting between visits, so consumption is a continuous record rather than a monthly reading.
9 parameters8 continuous · 1 on event
Open
