ACCRA, GHANA MIOT MULTICOMIOT LIMITED [email protected] 023 210 0100
MulticomIOT MORE DATA. MORE VALUE.

What we do · RTUs & Gateways

RTUs & Gateways

The box between the site and everything else. It polls instruments, buffers locally, and forwards when the link returns.

What we measure

10 parameters on this area.

Every reading is timestamped on arrival. Where the link drops, the gateway holds the readings and forwards them when it returns.

Book a free remote survey

What we measure · RTUs & Gateways

10 parameters · 5 on a schedule · 5 reported on an event

  • Energy metersAC / DC·pulse, ModbusEvery minute
  • Dimmer and LDR%, luxEvery minute
  • Fuel sensorsL·%Every 5 minutes
  • Solar, battery bank, UPSU, I, SoC·V, A, %Every minute
  • Fire and smoke detectorsstateOn change
  • Flood detectionstateOn change
  • Gas and water leak detectionstateOn change
  • GPS and asset trackinglat, lonEvery minute
  • Geofencingin / outOn change
  • On/off device controlcommandOn demand

What is fitted is decided at survey. This is the range we specify from, not a list of what every site gets.

Talk to an engineer

I want to know what my remote sites are doing